81912Issue 5SUPER HOT TOASTERUSERS (Pages 2-3)/ INSTALLATION (Pages 4-7)AND SERVICING INSTRUCTIONSTHIS CAT I3P APPLIANCE IS FOR USEON PROPANE GAS G31
Page 9
Page 10
Page 11No Fig 6 is issued in this document
Page 12
Page 13
Page 14
'(6&5,37,21The Super Hot Toaster has a single aerated burner, the design of which produces two parallel ribbons of flame thatrun across the f
Page 25(029$/2)'(%5,6RU6227'(326,7Allow the appliance to cool for two to three hours before removing all of the coals and ceramic block
,167$//$7,215(48,5(0(176$1'5(*8/$7,216The appliance must be installed by a competent person in accordance with the current Gas Safety (Install
&217(176&+(&./,67 (See figure 13 for identification)VENT BOX ASSEMBLY C/W: Burner assembly, Brass trim, Recess cavity shelf.1 Simulated
72&+(&.7+($33/,$1&(6(77,1*35(6685(/($.7(67A Pressure Test Point at the inlet elbow enables verification of the inlet pressure of
7. Re-light the appliance. With the control set to the maximum rate (large flame) position, place the Fire front &fret in position and leave to h
B. SERVICING COMPONENTS BELOW THE BURNER ASSEMBLYTo remove trim, lift vertically to allow the formed tags in the rear of the trim to slide out of the
),5()52176)5(7668,7$%/()257+,6$33/,$1&(.The illustration shown is the recommended MACH II Front and Fret, if an alternate Front and Fret i
Commentaires sur ces manuels